nasaspaceflight.com/2026/10/pld-system-level-testing-miura-5-three-vehicles PLD Space begins system-level testing of Miura 5 as first three vehicles take shape
PLD Space now aims to fly Miura 5 for the first time in the first half of 2027 from Kourou, French Guiana, and a fully integrated second stage is entering system-level testing in Teruel. The Spanish company is building three vehicles in parallel, two qualification units and the first flight article, so test lessons can feed straight into flight hardware.
— via NASASpaceFlight.com, Chris Bergin